?>

Taiba 2 & Qassim 2

The Taiba 2 & Qassim 2 Projects (twin projects) involve the development, design, engineering, financing, and the operation and maintenance during the term of the PPA (25 years). The total production capacity is 3.6 GW (1.8 GW for each), with a total investment of USD 3.7 billion.

Al Olaya, Riyadh, Saudi Arabia