Taiba 2 & Qassim 2
The Taiba 2 & Qassim 2 Projects (twin projects) involve the development, design, engineering, financing, and the operation and maintenance during the term of the PPA (25 years). The total production capacity is 3.6 GW (1.8 GW for each), with a total investment of USD 3.7 billion.
Consortium Members:
40%
Al-Jomaih
Energy & Water
30%
Ajlan & Bros
20%
Buhur
10%
EDF